About the project
Perlen Papier AG, a leading family-owned company and Switzerland's number one manufacturer of high-quality magazine and newsprint paper, has completely renovated its steam boiler, which had been out of service for around ten years, and put it back into operation.
Rey Technology carried out the retrofit of the steam boiler and acted as the general contractor (GC), coordinating the subcontractors. The refurbishment involved several important steps. First, all the necessary documents to ensure functionality were obtained, including a risk analysis and SIL classification. The flue gas ducting was fundamentally rebuilt by dismantling the existing catalyst and adapting the turning chambers to route the flue gases through the classic 3-pass boiler.
In addition, the old smooth-tube Eco was replaced by a new Eco from Ecotherm, which led to a reduction in exhaust gas losses. The flue pipes in the third pass were replaced, including the necessary metalwork and welding, as well as X-ray inspections and pressure tests. All boiler fittings and seals were checked or replaced. The old burner was replaced by a modern Saacke burner with electronic control. In addition, a new gas line and feed line were installed.
The excellent cooperation with the Perlen Papier project team contributed significantly to the success of the project. Thanks to careful planning and implementation, the steam boiler was able to be put back into operation on schedule. This represents a significant advance for steam production at Perlen Papier and underlines the company's innovative strength and ecological responsibility.
The collaboration with Rey Technology in connection with the project was very pleasant and goal-oriented from start to finish. Their high level of expertise was particularly helpful in planning and developing the individual steps, including compliance with environmental aspects such as flue gas emissions, operational safety, and plant safety. The precise coordination of the project steps, from implementation to project completion, ensured that 100% of the objectives were achieved. Rey Technology was recommended to us. Based on our positive experience in this project, we are happy to recommend Rey Technology to others.
Pierre Nydegger, Energy Management Specialist at Perlen Papier AG
Advantages for the customer
- Minimization of energy losses by replacing the old smooth-tube Eco with modern combustion technology
- Rapid recommissioning ensures production and planning reliability
- Efficient project management through general contractor role with transparent coordination and adherence to deadlines
Boiler control (Rey)
- SIEMENS SIMATIC S7 1514SP Fincl. Comfort Panel
Burner control (Saacke)
- Se@vis FSC fail-safe control incl. HMI
Communication
- PROFINET / MODBUS TCP
Figures
- Contents: 46,000.0 liters. 18.5 bar
- Burner output MAX: Natural gas 20 MW / Heating oil 17.5 MW
Services provided by Rey
- Function as general contractor for all trades and budget monitoring
- Creating the implementation concept
- Carrying out risk analysis and SIL classification in cooperation with the operator
- Project management in accordance with EN50156, including SIL verification
- Functional description
- Manufacture, delivery, and installation of new control cabinets
- Electrical installation
- Replacement of boiler control system; Software engineering PLC and visualization
- Function test
- Acceptance with external control bodies (SVTI and eco swiss)